2002
....... Thales and Darfon Electronics Corp. Announce creation of LTCC Joint Venture.
....... Taiwan facility 5000 square meters including clean room and office area constructed.
2002
....... DT Microcircuits Corp officially turn on operation.
....... 1st LTCC volume production lines was transferred from Thales,France and installed successfully in DT,Taiwan site.
2002
....... 2nd LTCC volume production line was transferred from Thales,France and installed successfully in DT,Taiwan site.
....... Complete LTCC production line pilot-run and qualification and start volume running from Taiwan site.
....... LTCC production lines in Taiwan site were qualified by major customers and start volume delivery.
2003
....... Ramp up to 2.8 million square inches of tape per month production in Taiwan site.
2003
....... 3rd LTCC volume production line was transferred from Thales,France and installed successful in DT,Taiwan site.(maximun capacity from Taiwan site is 5 M sq inches of tape per month)
....... ISO9001:2000 certified
2003
¡@
Zero-Shrinkage process available
2004
¡@ISO
14001 certificated
2004
¡@
Process Audit Approval by European Automotive client |