2002
.......

  • Thales and Darfon Electronics Corp. Announce creation of LTCC Joint Venture. .......
  • Taiwan facility 5000 square meters including clean room and office area constructed.

    2002
    .......

  • DT Microcircuits Corp officially turn on operation. .......
  • 1st LTCC volume production lines was transferred from Thales,France and installed successfully in DT,Taiwan site.

    2002
    .......

  • 2nd LTCC volume production line was transferred from Thales,France and installed successfully in DT,Taiwan site. .......
  • Complete LTCC production line pilot-run and qualification and start volume running from Taiwan site. .......
  • LTCC production lines in Taiwan site were qualified by major customers and start volume delivery.

    2003
    .......

  • Ramp up to 2.8 million square inches of tape per month production in Taiwan site.

    2003
    .......

  • 3rd LTCC volume production line was transferred from Thales,France and installed successful in DT,Taiwan site.(maximun capacity from Taiwan site is 5 M sq inches of tape per month) .......
  • ISO9001:2000 certified

    2003
    ¡@
  • Zero-Shrinkage process available

    2004
    ¡@
  • ISO 14001 certificated

    2004
    ¡@
  • Process Audit Approval by European Automotive client
  • ¡@